WHY WHOLESALE 19” NETWORK CABINET FROM BOLEIN

We are a company that values customer satisfaction. We always aim at producing and delivering quality 19” racks & cabinets that meet all your needs.

With 15 years of manufacturer experience, BOLEIN is well-versed in this field. Yes, you are dealing with masters. You can trust them with your needs and expectations.

Need proof? Why don’t you contact us? So that we can schedule an online visit for you. We do not promote offline visits at the moment because of the COVID-19 pandemic. However, this activity will resume as soon as the pandemic is over.

  • We are certified; BOLEIN is CE and Rohs approved.

  • The full range covered from 4U to 60U

  • Excellent Loading Capacity up to 2000KG

  • Well-equipped imported production equipment

  • Warehouse located in Dubai to make a local service in GCC

  • 5 Years warranty for 19” racks & cabinets

  • Support OEM/ODM custom service

FULL PRODUCT RANGE MEET YOUR NEEDS

19” Racks & Cabinets

4U server cabinet
27ru server rack
Open Rack
Flush Mount ONU Cabinet

Copper Solutions

Bulk Lan Cable
Patch Panel
Patch Leads

Networking Tools & Accessories

ESTIMATED WHOLESALE PRICE

All the money paid to BOLEIN for the purchase of their products is secure. Below is an outline of the costs you will incur:

Sample Fee

Pay a minimal amount in case you need a sample network cabinet. Well, this money is for a single sample, if it is one that you need.

Design Fee

Pay a small fee for consultation of any designs you want for your network cabinet’s artwork OR Labels.

Shipping Fee

This is the amount of money that you will pay for the transportation of your products from the factory to your doorstep. BOLEIN offers you the convenience of any kind

Our facility

Assemble Fee (Optional)

You can choose both Flat packing and well-assembled cabinets. If you prefer the assembled type, we will charge a little more for labor costs.

Deposit Payment

You can decide to either pay the full amount or pay a 30% deposit for the wholesale order.

Balance Payment

Complete your payment within a certain period before dispatch and receive the products you ordered for.

ESTIMATED MANUFACTURING AND SHIPPING TIMES

We work fast. With the increasing number of customers approaching us, we have no other option but to prioritize speed. Let’s look at the whole process of manufacturing and shipping:

1. Time of  manufacturing & assembling

Purchase the raw materials (SPCC cold rolled steel) into the factory. After bending, punching, welding, and surface powder coating during the manufacturing process.

2. Time of  packing all products

The staff assembles the cabinets and packs the products in cartons. They take a short time because it is an easy task.

container

3. Time of custom declaration 

Goods were loaded into containers and transported to the loading port, and then make the customs declaration.

4. Sea transportation time

Once the products leave on board, you will receive an alert from the shipping company. Then you can plan how to collect your goods.

CONTACT  BOLEIN TO START YOUR BUSINESS

Have a look at the whole process and get a start with us:

  • Purchase of raw materials SPCC Cold Rolled Steel

  • Produce and confirm samples if necessary.

  • Confirm packaging and labeling

  • Arranging mass production

  • Assembling and packing

  • Finished product inspection

  • Preparation of customs clearance documents

  • Arrange transportation